
The vertical soil core sampler is inserted into the soil using a heavy hammer |

When the soil is hard or dry, a larger hammer is required to insert the soil sampler
|

In soft sandy soils, a smaller hammer is needed.
|

The handles are used to maintain vertical penetration of the sampler without risking injuries to the assistant
|